top of page
ProAltus Group Logo.png

Façade Lighting at Prestigious London Hotel

London, Park Lane

Client Logo

“This was a technically sensitive installation on a high-profile façade. The focus was on delivering precise installation while maintaining safety, coordination and minimal disruption in a live, high-footfall environment.”


Natalie Branch, Operations Manager, ProAltus

Client Logo

More Projects

London, Park Lane

Façade Lighting at Prestigious London Hotel

London, NW1

Roof Access & Fall Protection Strategy

City of London

Facade Works & Roof Access Safety Upgrade 

London, NW5

Roof Access Safety Upgrade at Multi-Level Commercial Building

London, Knightsbridge

Facade Repairs & Tensioned Debris Netting Containment at Prestigious Knightsbridge Townhouse

London, Mayfair

Fire-Rated Glazing & Façade Access Support

Essex Coast

Martello Tower - Historic Building Restoration

London, Mayfair

Rope Access Survey & Façade Support Cladding Installation

London, Mayfair

Facade Works & Doff Clean on Historic Building

London, SW17

Fall Arrest - Design & Installation

Greater London

Innovative Tensioned Netting System for Greater London Commercial Centre

London, DA1

Tailored Access Strategy Featuring Hybrid Systems & Regulatory Compliance

Safecontractor Logo.png
Smas Logo.png
Constructionline Gold.png

ProAltus supported the installation of façade lighting to the front elevation of The Dorchester Hotel, providing rope access operatives to enable safe and efficient access to otherwise inaccessible areas of the building.


Working alongside C.A.G Electrical Contractors, our team assisted with the installation of twenty-seven luminaires across the south façade, using rope access techniques to position operatives accurately while maintaining full control of the working environment.


The project required careful planning and coordination, including the use of temporary deadweight anchor systems at roof level, implementation of exclusion zones below the working area, and close collaboration with other contractors operating on the façade.


Given the nature of the building and its location, works were carried out with a strong emphasis on safety, precision and minimal disruption, including some out-of-hours working to suit site constraints.


The result was a safe and controlled installation process, enabling high-quality façade lighting works to be completed efficiently while maintaining strict safety standards and coordination across a complex live site.